Meadowbrook Middle School

This Project is Under Construction

Key Information

Scope of Work:
This project includes a combination of new construction, building renovations, and site improvements.
 
Program Initiatives Addressed:

  • Building Addition(s)
  • Classrooms and Science Labs
  • Media Center
  • Cafeteria/Cafetorium
  • Collaboration Space(s)
  • Interior Corridors
  • Secured Front-Entry Vestibule
  • Security and Life Safety Upgrades
  • MEP (Building Utilities)
  • Accessibility and Site Improvements
  • Furniture, Fixtures and Equipment
  • Technology and Digital Upgrades
  • Removal of Portable Building(s)
Design Process
Construction Process
2001 Ederville Road, Fort Worth, TX 76103, USA
Budget
$48,454,422
New Construction
21,579 SF
Renovations
84,869 SF
Construction Start
November 03, 2025
Anticipated Opening
Continued Use
Anticipated Construction End
Q1 2028

Project Team

Cameron Whitaker
Owner’s Representative
Pete Valdez
Senior Construction Manager
Contractor
Northridge Construction Group
pfluger logo.
Architect
Pfluger Architects

Project Updates

Subscribe to emails with updates for this project. You’ll receive a verification email after your first project sign-up.
06/22/2026
Meadowbrook Middle School:
Phase 3

Phase 3 interior renovations of the existing campus are rapidly advancing as demolition nears completion and framing activities are underway.

05/21/2026
Meadowbrook Middle School:
Admin Addition’s Concrete Slab

The concrete slab at the new Administration Addition has been poured. Structural steel erection will soon follow. The Science Addition’s site has been prepared for upcoming concrete slab pour. Internal renovations continue with drywall hanging, painting and ceiling grid installation.

04/23/2026
Meadowbrook Middle School:
Maintaining Momentum

Foundation work for the new Administration Addition continues to advance, with piers, grade beams, and underground MEP now complete. Site preparation for the Science Addition remains ongoing. In the existing building, Phase 1 renovations have progressed to drywall installation and finishing.

03/25/2026
Meadowbrook Middle School:
Foundation Progress

Foundation work is advancing on the new Administration and Science Additions, with site preparations and structural work underway. Renovations in the existing building have begun, with interior improvements now in progress. 

02/25/2026
Meadowbrook Middle School:
Building Addition Foundation

Piers have been drilled and poured, with grade beam excavation underway at the Administration Addition site.  The Science Addition site subgrade excavation is in currently in progress.

01/27/2026
Meadowbrook Middle School:
New Building Additions & Phase 1

The Additions are underway, with pad excavations currently in progress. Phase 1 renovation areas have been prepped and are ready to begin. Retaining wall construction is in progress, with excavation activities initiated & site work advancing.

12/18/2025
Meadowbrook Middle School:
Under Construction

Meadowbrook Middle School is now under construction and Northridge Construction Group had begun implementing site logistic plans, including installation of construction fencing and the onsite trailer. Site earthwork is anticipated to begin over winter break in preparation for foundation work associated with the New Additions.

06/20/2024
Meadowbrook Middle School:
Conceptual Exterior Renderings

Meadowbrook Middle School is anticipated to begin construction near the end of this year (Q1 of 2025). The conceptual photos shown depict the proposed New Addition buildings that include Performing and Visual Arts, Science Labs, and Weight Room.