The Rosemont Middle School project will receive major interior renovations throughout the campus. These include a new secured front entry vestibule, corridor upgrades, and life cycle improvements including mechanical, electrical, plumbing (MEP), fire suppression system, upgraded technology and security, interior upgrades to the common areas, media center, visual arts classrooms, fine arts rooms, science labs, special education classrooms (SPED), weight room, removal of the portables, and minor exterior site improvements. The addition will feature new administration, cafeteria, and kitchen (which will serve as a storm shelter), and will connect both the middle school and elementary school to form one campus.
The Huckabee and Procedeo team continues to work through the construction document phase of design for the Rosemont Middle School project. The general contractor, Reeder / Summit (a joint venture) anticipates starting construction in Q4 of 2024.
Pictured are conceptual renderings of the school’s exterior, where a proposed additional building will connect the two existing structures- creating one campus.
As the Rosemont Middle School project progresses into the construction document phase, updated conceptual renderings of the interior and exterior are now available to review.
Exterior conceptual renderings of Rosemont Middle School
PROCEDEO is the Owner’s Representative for the 2021 FWISD Bond that was approved by Fort Worth voters in November of 2021.